Challenge
A major high-frequency trading firm faced a critical challenge: it needed to deploy 500 kW to 1 MW of infrastructure rapidly in a data center environment that could support high-density air cooling immediately, with the potential to transition to liquid cooling in the future.
On top of this, the firm required ultra-low latency connections to its existing network points of presence (PoPs). Unfortunately, its current providers lacked the capacity and viable options for expansion, putting its growth and performance objectives at risk.